Tower Central
The Tower Central development has seen the transformation of an iconic heritage building into a commercial and retail building, which has been linked with a new 6-storey tower. The Centre incorporates a mix of commercial and retail spaces which flow out to the public realm at ground
level to activate the streetfront.
Overview
Location
Ipswich CBD
Value
$1.04M
Principal Contractor
Rohrig (QLD)
Scope
- Decommissioning of the existing Electrical and Communications
installation - Underground reticulation system – conduits and pits (Energex HV
conduits) - Power Distribution System including transformer culvert,
consumers mains, sub-mains, main switchboard and tenancy
distribution boards - Cable support systems
- Power requirements to suit multi tenancy commercial complex
- Emergency Lighting System installed in accordance with AS
2293 - Architectural feature lighting
- Energy efficient lighting
- Access control system
- Certified Cat6 Communications System
